PROJECTS - Cleaning and Inspection

In the port of Zeebrugge the 227 m long vehicles carrier Elektra needed cleaning and inspection on the propeller and bow thrusters. In time the surfaces of these submerged parts are getting covered with marine growth, causing an increase of the drag resistance. Using special cleaning equipment this drag resistance is reduced resulting in lower fuel consumption, savings on the fuel costs and meaning also less pollution of the environment.

Furthermore an inspection was executed to determine the condition of the propulsion systems on the outboard of the ship. Reason for this is to locate any points of notice that require intervention or extra attention with the next upcoming maintenance job.