Total-Epit requested Bluestream to inspect a pipeline, which is situated between the subsea structure K4Z and platform K5A.
This project was carried out by Bluestream in collaboration with A. Hak. The latter being specialized in performing inspections on the inside of pipelines.
For this inspection job several special tools, the so called PIG’s (Pipeline Intervention Gadgets) were launched into the pipeline, using custom made PIG launchers/receivers. These were installed on both ends of the pipeline (subsea structure side as well as on the side of the platform). The schematic figure shows a cross section of a pipeline with pig’s in it.
Despite some delay in the diving operations due to weather conditions, the tools were installed successfully and the first pig was launched by pumping N2 behind it. The purpose of this first ‘pig-run’ is to remove any product residue out of the pipeline in an environmental friendly way. Then some more PIG’s (equipped with brushes or foam) were launched to clean the pipeline by using bio-degradable soap. By doing so the pipeline was ready for inspection with the so called ‘intelligent pig’s’. These pigs are equipped with ultrasonic thickness measurement instruments.
After the recorded data had been successfully retrieved from these tools, the pipeline was succesfully put back into service again